Medical Research / Laboratory Previous

Academic Research Building 5th Floor Lab Renovations – UF Campus Gainesville, FL

Description of Work: Renovations in the ARB Building were successfully completed in preparation for a new department chair joining UF.  The laboratory space remodel was done to meet the needs of the department chairman and his research criteria.  The two main labs remodeled included VCT demolition and reinstallation with “C-Frame” casework in place, patching and painting of the entire space, minor ACT replacement and most importantly, refinishing of existing laboratory tops.  Working hand-in-hand with our painting subcontractor, we had a three week window to find a product able to withstand the demands of a laboratory setting and perform mock up areas in order to obtain approval from the client, UF, and EH&S.  This innovative solution is a great example of the JEDCG team working together to meet the needs of our client.

Client: University of Florida
Completion Date: December 2013

BANCF  bbbaccreditation   usgbc logo hipaa-certifiedosha                 

 

 


Follow Us:  FB-f-Logo  blue 29

Cloud Server Login

J. E. Decker Construction Group, LLC
P.O. Box 358973
Gainesville, FL 32635
Office: 352.448.1428
Fax: 888.456.2695