Benton and Larsen Halls Plaza Renovations – UF Campus Gainesville, FL

Description of Work: Working with SVM Architects and UF authorities, both the east and west plaza areas were demolished in their entirety down to a newly discovered “bond breaker” which sits below the tile mud bed.  New surface drains were added to help with water runoff from the plaza decks as well as the catwalks that connect the two buildings.  The existing stair towers on both the east and west ends of the plaza have received an aggregate and epoxy sealer combination in an effort to ensure safety as the tile becomes very slippery under wet conditions.  The project took place in an active pedestrian area. Our team’s expert coordination proved effective as we managed traffic control, dust control, and material delivery for completion of this project. This project was split up into 5 phases in an effort to minimize daily pedestrian traffic disruption as well as enable adequate amounts of emergency egress.

Client: University of Florida
Completion Date: October 2014

BANCF  Chamber-logo-color     usgbc logo hipaa-certifiedosha                 

 

 


Follow Us:  FB-f-Logo  blue 29

Cloud Server Login

J. E. Decker Construction Group, LLC
P.O. Box 358973
Gainesville, FL 32635
Office: 352.448.1428
Fax: 888.456.2695